PREVENTIVE / BREAKDOWN MAINTENANCE/ RETROFIT NEW CNC / MECHANICAL RECONDITIONING
Preventive Maintenance :
- Prepare the Annual Maintenance Calendar and Maintenance check list.
- Execute the Preventive Maintenance as per schedule.
- Notice the abnormalities observed and report the same for corrective action
Breakdown Maintenance :
- Attend the breakdown complaints within 8 hours of receipt of call. (Between 8.00am to 8.00pm)
Retrofit with new CNC :
- Study the retrofit requirement of the customer and prepare the feasibility report with cost estimate.
- On acceptance, building of new panel (if required) with wiring.
- Design the mechanical modifications required for the retrofit activity and manufacture the same.
- Complete the machine wiring.
- CNC system power ON and software interface.
- Testing the machine functions and interlock to the customer satisfaction.
Mechanical Reconditioning / Rebuilding the Machine :
- Study the reconditioning / rebuilding requirement of the customer and prepare the feasibility report with cost estimate.
- On acceptance, list out the spares required for replacement and identify the supply source.
- Inform the supplier for procurement.
- Design the mechanical modifications required for reconditioning activity and manufacture the same.
- Complete the reconditioning with high degree of scraping.
- Testing the machine accuracy to the standards.